Case Studies
To read about real life applications and Case Studies of our Rheem Hot Water Solutions, click the links below.
10 Valentine Ave, Parramatta Case Study
Air to Water Commercial Heat Pump
This project required a high-efficiency hot water plant capable of accommodating 10 showers and a 2000-litre load requirement over a two-hour peak.
St Mary's Tower Retreat Centre Case Study
Warm Water | Commercial Heat Pump | Heavy Duty Electric Storage | UV Disinfection
Rheem was asked to provide a cost-effective solution to provide for the hot water and warm water needs of up to 50 people.
Southern Bottling Company Case Study
Raypak Hot Water | RT Series Storage Tanks
The Southern Bottling Company recently commissioned a new production base that specialises in the bottling of wines for niche markets. With hygiene critical, the plant needed a reliable, fail safe hot water supply for use in its cleaning and sterilisation procedures.
Prestons Lodge Solar Case Study
Warm Water | Heavy Duty Gas Storage | Lo-Line Direct Solar Collector | 610 Series | UV Disinfection
Prestons Lodge is a 132-bed aged care facility in Sydney. Rheem was approached during the design stage to provide an energy efficient solar and warm water proposal that included budget estimates, STC rebates and pay pack periods.
ICC Sydney Case Study
Raypak Hot Water | Tankpak Series 3
The revamped, $1.5 billion ICC Sydney at Sydney’s Darling Harbour is Asia Pacific’s premier integrated convention, exhibition and entertainment precinct. Rheem supplied eight commercial hot water plants that were used to service the theatre, convention and exhibition centres.
St Mary's Villa Case Study
Warm Water | Heavy Duty Gas Storage | Lo-Line Direct Solar Collector | 610 Series
St. Mary’s Villa is a two level purpose built Aged Care Facility that offers 99 single room accommodation with en-suite. The hot water requirements included servicing the 99 single rooms in addition to meeting the hot water demands of the kitchen, laundry, hairdressing, cafe and exercise room facilities.
Paragon Fitness Centre Case Study
Commercial Heat Pump | Heavy Duty Electric Storage | 610 Series
The centre has 8 showers and can cater for up to 180 people per day. Rheem was asked to provide an effective and economical hot water solution to meet the demands of the fitness centre.
Southern Ocean Lodge Case Study
Commercial Heat Pump | Heavy Duty Electric Storage | 610 Series | Heavy Duty Gas Storage
Sensitive, intimate and sophisticated Southern Ocean Lodge is a sanctuary of refined comfort and luxury, Kangaroo Island style. 21 guest suites with a hot water load of 2,400L over a 1 hour peak demand period. Due to the potentially cold climate an electric back up was included to supplement the heat pumps to ensure hot water was available on demand.